07.04.1/2 Railway Noise Overground (Day 6:00 a.m. - 10:00 p.m.) at Left/Right Nearest Roadside Development

Map Description

The railroad traffic noise map covers the above-ground networks of the main-line railway, rapid rail (S-Bahn) and subway (U-Bahn), which partially share the same route. It presents the overall evaluation levels measured on the building façades during the day (between 6 am and 10 pm).

Map Imprint

Conception:
Referat IX D (Grundsatz- und Planungsangelegenheiten des Immissionsschutzes) in coordination with Referat III F (Urban and Environmental Information System)

Data Processing and Map Production:
Gesellschaft für Informatik, Verkehrs- und Umweltplanung mbH (IVU), III F

Completed:
February 2005

Geoportal

  • 07.04.1 Railway Noise Overground (Day 6:00 a.m. - 10:00 p.m.) at Left Nearest Roadside Development

    PDF-Document (3.4 MB)

  • 07.04.2 Railway Noise Overground (Day 6:00 a.m. - 10:00 p.m.) at Right Nearest Roadside Development

    PDF-Document (3.4 MB)